Completed Contracts

Woodthorpe Hall Caravan Park

Integrated Group (M&E) have completed a new amenity building for Woodthorpe Hall Leisure Park near Alford.The building consists of changing facilities, laundry & a pamper room for the visiting tourers, a golf shop & changing facilities for the resident golfers, and administration offices for the

Read more: Woodthorpe Hall Caravan Park

 

New Typhoon Maintenance Facility

The contract was a new build consisting of a two storey office block and maintenance hangar with associated workshops and stores at RAF Coningsby for the new fleet of Typhoon aircraft. Both RAF and BAE Systems personnel will work together in the new

Read more: New Typhoon Maintenance Facility

   

Boat Storage Compound

The contract was a new build boat storage compound at Bridlington using heavy duty coastal columns and post top luminaires giving excellent lighting control minimizing light pollution. The luminaires were fitted with seagull spikes to avoid spoiling to the luminaires, boats and

Read more: Boat Storage Compound

 

Humber Seafood Institute

The 'Humber Seafood Institute' is a research and development facility based near Grimsby, and used by companies working in the fish industry. Completed in 2009 the project entailed the electrical installation to the 25,000sq ft office, research, process and

Read more: Humber Seafood Institute

   

HGV Test Station and Offices

The contract was a new build consisting of a two storey office block and a test-hall with training facilities. Work Completed: The office block incorporated the following services:- • Under-floor heating • Natural ventilation systems incorporating passive stacks and automatic opening windows

Read more: HGV Test Station and Offices

 

New Shoreline Offices, Grimsby

The contract was a new build consisting of a three storey office block and a stores building. The office block incorporated LPHW heating with air conditioning and mechanical ventilation systems. Lighting installation consists of automatic on/off and daylight dimming,

Read more: New Shoreline Offices, Grimsby

   

Canpack Factory, Scunthorpe

The contract was a refurbishment of the old MFI factory in Scunthorpe consisting of two, two storey office blocks and a new factory facility for the manufacturing of aluminium cans for the food and drinks trade. The electrical contract works carried out consisted of the full design,

Read more: Canpack Factory, Scunthorpe

 

Large Passive Lit ADS & Signposts

The contract was to supply and install lighting for 278 Works Cambridgeshire using passive signposts and passive electrical cut out systems. Lytec can offer a variety of passive solutions to meet your specification and programming needs.

Read more: Large Passive Lit ADS & Signposts

   

Page 1 of 2